In addition to the PCWA Communications Study, discussed previously, Timberline is excited to begin the new year with a kickoff meeting for Otto Pump Station, an Instrumentation, Controls, and Electrical (IC&E) project for the Albuquerque Bernalillo County Water Utility Authority.
On January 5th, Timberline met with the Water Utility Authority to kickoff the IC&E design for Otto Pump Station, a new water pump station providing drinking water to residents in Albuquerque. For the Otto Pump Station project, Bernalillo County hired Bohannan Huston, Inc. of Albuquerque to perform the pump station design with Timberline Engineering performing the IC&E portion of the design as a subconsultant. The project includes a Design Analysis Report followed by preliminary and final design resulting in a bid package for construction of the pump station. It is expected that Timberline will also provide construction support services.
These projects continue our long-standing relationship with the Albuquerque Bernalillo County Water Utility Authority and Bohannan Huston.
